Tuesday, January 18, 2011

Guangdong is now the

 Hui Jing Xian, Guangdong
to

pier destroyed by floods caused by Nianyu meter bridge depression, half a year date not fixed

Yangcheng Evening News reporter Wang Qi Man photo coverage: benefits to the county Kwai Tan Zhen, Guangdong has a nameless small bridge, a video popular recently because of the network: the original prop up the bridge piers were washed several did not, leading to the middle 20-meter-long sunken into the back arched bridge, half a year date, no maintenance, local daily on the dangerous bridge is still trembling from the past. Friends shouted,

14 morning, the reporters came to the county Kwai Tan Zhen Hui Xikou village, witnessed the

site: bizarre inverted arch bridge of 20 meters

Kwai Tan Zhen Long Xikou River south of the surface of the village, across a 60-meter-long bridge deck width of only 1.5 meters of reinforced concrete pouring cement, supported by piers of stone . Reporters on the scene strange scene: the middle section of the bridge about 20 meters long bridge Journalists toured the bridge less than 30 minutes, we will see more than 20 villagers from the bridge and from there on a motorcycle after roaring past --- has been riding a bicycle slowly, and some lug heavy burden, and some Tuoerdainv (see above), more shocking, and even a three-wheeled motorcycle also Look at them very much at home, the reporter pinched into a cold sweat.

reporters Zhuangzhao Dan himself on the bridge and back, went to the bridge segment depression, the feeling at the foot of the flicker. No wonder some users lamented, so dangerous,

Villagers: Flood damage is not half pier repair

bridge came from the village of Dai Bo Xikou, with reporters talking about this stone blocks, once destroyed by a flood 10 years ago, pier, rebuilt the village people and raise funds, instead of cement made of reinforced concrete bridge deck. In late June 2010, Hui County, torrential rains, Kwai Lake and so many trapped by flood water, road and bridge was washed away.

Dai Bo, and many other villagers, Xikou after the bridge into a dangerous bridge, had sent people to check out the higher authorities, but after a lapse of more than six months, and still have not seen someone to repair.

It is understood that the existing 7,000 Xikou village population, the majority of the village land in orchards Dragon River's south bank, the villagers have to cross the river each day labor, the other side of the bridge there are several villages, the bridge into the local roads on nearly ten thousand people.

Government: construction site near the new bridge will be raised

16, the reporter to get a response from the Government Tan Zhen Kwai: Xikou bridge is a major farming for local people to bridge the past, since the original flow of people to build simple and sparse, lack of maintenance, over the past decade has become a dangerous bridge, especially by last year's Dangerous situation, the Kwai Tan Zhen bridge was closed, both ends of the bridge, the Bypass 300 meters from the passage of a nearby bridge.

14
reporter at the scene did not find any related warning or forbidden line guard public security staff, local villagers said, need to pass back and forth across the river a few kilometers, in order to facilitate the livelihood of local villagers desperate frustration, continued from that day trembling

Kwai Tan Zhen official said, was added to the benefits to the county transportation department reported, the application support, maintenance and strengthening the bridge, and launched Xiangxian donors, plans to re-repair at the site near a new bridge.

No comments:

Post a Comment